[ Interactive Demo ]
Pareto Front Explorer
Synthetic data center — 48 racks, 8 CRACs, 2MW IT load. Every point is a Pareto-optimal configuration. Select one to explore the trade-offs.
Demo DC-01
ASHRAE Class A1 · 27°C limit
● Synthetic data
Pareto Front — 4 Objectives
— solutions
Pareto optimal Current operation● Drag to rotate · Scroll to zoom · Click to select
PUE
—
Max Inlet
—°C
Thermal Margin
—
Max IT Load
—MW
EU A-G Rating
Select a configuration
Operational Setpoints
Supply Temp—
CRAC Flow—
Chiller VFD—
IT Load—
Rack Thermal Map
8 rows × 6 cols · 48 racks
18°C
32°C
Trade-off Analysis
Select a point on the Pareto front to see the trade-off analysis vs. current operation.
This demo uses synthetic data generated from a simplified thermal model. Real deployments use surrogate models trained on actual BMS/DCIM telemetry, validated against CFD. Pareto front computed offline — no live optimization is running.